Lofthouse Padel Logo White

Home / Full Panoramic Padel Court

PRO Classic Padel Court

Our PRO Classic Padel Court delivers a perfect balance of performance, durability, and playability — engineered for clubs, facilities and private projects demanding professional-grade quality. Built with precision steel, premium tempered glass and tournament-ready lighting, this court is designed for high-intensity play and long-term reliability.

Standard Playing Area

20 m × 10 m regulation size for doubles play

Wall & Panel Design

3 m back wall height with tapered side walls

Steel Frame

3 mm structural-grade steel for strength and stability

Glass panels

12 mm tempered safety glass for superior resilience and ball rebound performance

Mesh Panels

4 mm electro-welded mesh for secure perimeter stability

Surface Finish

Hot-dip galvanised steel with polyester powder coating for maximum corrosion resistance

Wind load rating

Designed to withstand winds up to 140 km/h

Lighting System

High-performance 500 Lux LED lighting for consistent, competition-level play

Typical Lead Time

6 – 12 weeks from order to installation (subject to site access and schedule)

Features and Benefits

Robust Structural Construction

The PRO Classic Padel Court features a rugged 3mm steel framework, engineered to deliver outstanding durability and minimal flex under play. This reinforced structure lays the foundation for decades of premium performance and low maintenance.

Player Safety & Comfort

All glass and mesh fixings are professionally executed to eliminate sharp edges and protrusions, reducing injury risk and enhancing on-court comfort. The court design promotes safe, uninterrupted play even during intense rallies.

Lofthouse padelstars 28.03.25 117

Professional Compliance

Our PRO Classic design meets or exceeds International Padel Federation standards, with hot-dip galvanised net posts and regulation-compliant court geometry to support official training and competitive matches.

High-Impact Glass Performance

Tempered 12 mm safety glass panels deliver exceptional impact resistance and consistent ball rebound characteristics, enhancing play quality while safeguarding players and spectators alike.

Premium Illumination

The integrated 500 Lux LED lighting system ensures even, bright illumination across the entire playing surface — ideal for evening play, indoor venues, and broadcast-ready events.

Installation & Maintenance

Foundation Requirement

A level concrete slab with specified tolerance is essential for stable installation. Detailed anchor placement drawings are provided for groundwork coordination.

Routine Care

Weekly brushing, debris removal and net tension checks help preserve turf and performance. Periodic inspection of glass and steel fixings prolongs court life and maintains warranty validity.

Lofthouse padelstars 28.03.25 23
Lofthouse padelstars 28.03.25 12

Warranties

We stand behind our court components with robust warranties — typically including multi-year coverage on steel structure, glass panels and lighting systems — when maintained according to guidelines.

Where It Excels

The PRO Classic Padel Court is versatile and adaptable for:

  • Indoor sports halls and club facilities
  • Outdoor courts in parks and recreation centres
  • Commercial leisure venues
  • Residential and hotel wellness spaces

Frequently Asked Questions - Pro Classic Padel Court

A flat concrete slab with ±3 mm levelness over the court footprint is essential for stability. Anchor bolts are set in cast sleeves during the pour, so precise placement drawings must be submitted before slab works. Standard anchor spacing and load calculations are provided in our installation guide to ensure your foundation integrates seamlessly with the steel framework.

Routine care keeps your court in peak condition:

  • Weekly: Brush turf to redistribute sand, clear debris, and check net tension

  • Quarterly: Top-up infill sand, torque-check steel and glass fixings, treat moss or algae on shaded outdoor courts

  • Annually: Service visit for deep-carpet cleaning, line repainting, and net strap replacement

These simple tasks preserve warranties and extend turf life to 5–7 years.

We back every court with industry-leading guarantees:

  • Steel framework: 5-year anti-corrosion warranty

  • LED lighting: 3-year performance warranty
    Following our maintenance schedule is required to keep these warranties valid.

Our Full Panoramic Court excels in all settings:

  • Indoor halls with HVAC integration and clear-height requirements met

  • Outdoor parks and clubs—wind-resistant to 140 km/h and UV-protected

  • Rooftop terraces structurally assessed for point loads

  • Commercial centers, blending aesthetics with spectator-friendly design

Beyond the concrete slab, plan for:

  • Drainage and stormwater management to avoid pooling

  • Electrical supply routed to floodlight columns (typically 400 V three-phase)

  • Access for delivery trucks and crane or lifting equipment for panel placement
    Early coordination with your contractor ensures uninterrupted installation.

Typical lead times range from 6–10 weeks:

  • 2–4 weeks for component fabrication and quality checks

  • 2–4 weeks for shipping, customs clearance, and local logistics

  • 3–10 days onsite for assembly, depending on court quantity and site conditions

Plan your project timeline accordingly to align groundworks, material delivery, and assembly crews.

Lofthouse Padel 110

Contact Us

Curious about building a Padel court?

Request a consultation or our FREE brochure to explore court options, pricing insights, and what’s included—everything you need to plan your ideal padel facility.

Part of the Lofthouse Construction Group

© 2026, Lofthouse Residency. All Rights Reserved

Registered in England & Wales | Company No. 11269888 | VAT No. GB 30 1554 934 | Privacy Policy

Download Padel Brochure

Richard Faulkner

Technical Manager

With over 20 years of experience in the construction and housebuilding industry, Richard has led Technical, Planning, and Design teams for construction and PLC housebuilders. Having assisted in the delivery of key developments such as Kew Riverside and Grosvenor Dock in Chelsea, and managing projects ranging from 50 to 750 homes, complete with schools, sports facilities, and retail units.

His experience spans bespoke high-end homes, retail and commercial schemes. He has also contributed to innovative projects like the Northstowe new town near Cambridge and is a strong advocate for modern construction methods.

Carol Bolton

Office Administrator, Lofthouse Construction Group

With over 25 years of experience in finance and office management across sectors including healthcare, logistics, and construction services, Carole has overseen full finance functions for organisations ranging from SMEs to multi-site charities. She has managed payroll for over 130 employees, implemented credit control procedures, and prepared management accounts through to trial balance.

Her experience spans both strategic financial oversight and hands-on administration, including bank reconciliations, pension submissions, budget management, and diary coordination. A proficient user of payroll and accounting software, she has also liaised with external accountants to ensure smooth year-end processes and compliance with tax regulations.

Carole is a highly adaptable professional, with a strong background in credit control, payroll, and office operations, and is valued for her attention to detail, reliability, and ability to streamline processes in fast-paced environments.

Kevin Smith

Contracts Manager, LPCS

With over 30 years of experience in the construction industry, Kevin is a seasoned Contracts Manager specialising in RC concrete frames and groundworks. Starting his career on-site and progressing through roles in both construction and contracts management, he brings a deep understanding of every phase of project delivery.

Notable high-profile projects that he has worked on include Battersea Power Station and the O2 Arena, where he played a key role as a construction manager. In addition to commercial landmarks, Kevin has also contributed extensively to residential construction, overseeing the groundworks and installation of superstructures for private bespoke homes.  

His dedication to quality, safety, and efficiency continues to drive excellence across all aspects of his work.

James Bourke

Partner (Lofthouse Premier Construction Services)

James Bourke brings 30+ years of experience in the construction industry, managing groundworks projects exceeding £100 million. As London Regional Director at O’Keefe Construction, he scaled the business unit from £12 million to £60 million in turnover. At Deep Contractors, he launched a business unit generating £20 million in profit.

His portfolio includes prestigious developments such as:

  • Wembley Regeneration
  • O2 Arena Renovations
  • Wimbledon Court 2
  • Battersea Power Station (Phase 1)
  • A 21-storey RC frame for modular apartments, utilising Europe’s tallest freestanding crane

James’s leadership has been instrumental in driving growth for clients such as Vastint, Barratt, and Berkeley Homes.

Ryan Bourke

Engineering and Operations Manager

After graduating from Cardiff University, Ryan joined Walsh Associates as a structural design engineer, focusing on high-rise reinforced concrete structures in London.

He later became a project engineer, managing key developments like Lombard Square (1,750 units) for Berkeley Homes and Ballymore. His role involved liaising with contractors, ensuring design information met project deadlines.

Now transitioning to the contractor side, Ryan aims to leverage his consultancy experience to bring a fresh perspective and enhance efficiency in the fast-paced construction industry.

Jayne Sykes

Director

Jayne brings extensive business expertise to Lofthouse Construction Group, having successfully founded, expanded, sold, and integrated businesses in her role as Chief Operating Officer.

She led key functions—including Finance, IT, Marketing, HR, Legal, Administration, and Project Management—driving innovation and operational excellence.

At Lofthouse Construction Group, she is focused on implementing structured processes, systems, and disciplined approaches to support the company’s rapid growth and exceptional team.

Steve Ross

Project Manager (Groundworks)

Steve brings 35+ years of experience in the construction industry, specialising in grounds, basements, and concrete frames of up to 14 stories.  

He has successfully managed numerous multimillion-pound projects for leading companies such as Balfour Beatty, Kier, Wates and Taylor Wimpey, overseeing teams with 110 personnel.

Gary Higgins

Senior Buyer, Procurement Manager

He has 35+ years in property development, specialising in bespoke projects like luxury apartments.  

His roles at Antler Homes and Millgate Developments have refined his expertise in procuring high-end materials.  

As Procurement Manager, he ensures superior quality and value across all projects, enhancing client satisfaction.

Daniel Mosey

Commercial Manager

Daniel has 18 years of experience in the construction industry, with strong expertise in Estimating, Commercial Management, and Structural Steelwork. He has worked across Groundworks and RC Frame projects from design to installation, managing sub-contract packages exceeding £5 million on high-rise residential developments in London, as well as major rail and commercial projects including Crossrail, Heathrow, and Gatwick Airports.

Ann Lofthouse

HR & Operations Manager

Sharp, with an inquiring mind and prodigious attention to detail, Ann's successful career started in the world of banking, with roles in financial advice and management.

This expertise was put to excellent use, enabling a move into high-level finance and accounting recruitment for investment behemoths such as Citibank, Deutsche Bank, Merrill Lynch and technology giant NTL.

After taking a career break, she played a significant role in developing two bespoke, accessible homes while raising two beautiful children.

Ann's focus is now on talent acquisition, retention, and systems management in the demanding Lofthouse Residences HR & Operations Manager role.

Steve Carmichael

Commercial Director

He has 30+ years of experience in construction.

As Commercial Director (QS), he oversees project stages from acquisition to completion.

Previously, he was Senior QS at Millgate Homes and Partner at Quantum Merit Associates.

His expertise drives profitability and operational efficiency for sustainable growth.

Paul Beaney

Strategic Director

Paul Beaney has 30+ years of experience in the construction industry, beginning his career at Berkeley Homes before becoming Managing Director at Millgate Homes.

During his tenure, he contributed to the rapid growth of the company, overseeing the construction of over 1,200 homes, which ultimately led to Millgate Homes' acquisition by Countryside.

Currently, as Strategic Director at Lofthouse Residences, Paul leverages his extensive network of suppliers, subcontractors, architects, and land agents to shape the company’s long-term vision.

His strategic insights and industry expertise are vital for driving continued success and ensuring robust growth in a competitive market.

David Lofthouse

Founder

David Lofthouse brings 20+ years of investment banking experience to the construction industry, seamlessly transitioning his financial expertise into luxury property development.

After successfully creating two bespoke luxury homes, he founded Lofthouse Residences, driven by a vision to transform the sector.

David leverages his strategic insight to establish a business that offers concierge-level service, setting new benchmarks for innovation, creativity, cost-efficiency, and quality.

His commitment to excellence and ability to navigate complex financial landscapes position Lofthouse Residences as a leader in the luxury market, ensuring sustained growth and exceptional value for stakeholders.